Scroll

Regional Water Authority, CT Cost: $30M | Project Area: Milford to Branford Service Area

On-call services began in 2000 and continue today with numerous waterworks construction and road restoration construction projects throughout the Regional Water Authority service area.

Task:

  • Perform design and construction administration/observation services of water main relocations required as a result of ConnDOT and other project construction

Challenge:

  • On an accelerated on-call basis provide:
    • Preliminary engineering and construction plans and specifications
    • Survey
    • Test pit layout
    • Interpret test pit results and determine if conflicts exists; provide solutions as necessary
    • Water main design
    • Preparation of relocation plans and coordination
    • Full construction observation/administration services
    • Maintain and track eligible cost for reimbursement for projects sponsored by ConnDOT and/or municipality.

Solution:

  • Luchs provides qualifications in both the technical aspects of proper water main and appurtenant construction as well as ConnDOT procedures for maintenance and protection of traffic and pavement restoration